Our across-the-street neighbor needed better water pressure, so the city removed the 3/4" water line from the water main to his house and replaced it with a 1.5" water line.  Papa had to move our trash outside the barricaded area since it was trash day and we really wanted the trash to be picked up.

The water main is on our side of the street, right under the moonflower that Papa's been babying all  Spring.  Sorry moonflower!  

Pretty cool how they dug under the curb so the concrete won't have to be replaced.

The new water line

Making things as good as new.  Well, except for the moonflower.

Almost done.

Asphalt is in place.  The city has promised someone will be out with St. Augustine to replace our grass.  No mention of a moonflower though!